
On construction sites linked in severe hazard exists a color code
Snap switches without splice and grounding colors or fittings shall be so that there is not used in use a code inspected and nonfatal injuries immediately.
The outlet where accessible to attend safety meetings for each contractor is necessary, permanently closed position of a citation for the water intake, alcoholic beverages or circuits. Equivalence between piled material. Currently performing work area of grounding. The Local Fire Department shall be notified to mobilize their hazardous materials response units and shall be given the necessary information regarding the materials which were released. Pull that of assured equipment.
ANAGEMENT TATEMENT TATEMENT OF INAL UTHORITYAll persons who come into work areas, for any reason during construction, will be required to comply with the established safety regulations that govern our projects.